Technical inspection of an installed system

Technical inspection

Geomembrane inspection and quality control

We detect and document issues before covering, filling, or accepting the system, verifying execution against project requirements.

Accept the work based on evidence, not assumptions

The material, acceptance criteria, construction method, owner's requirements, and project stage determine the relevant controls. Inspection is not improvised: it is defined from the specification and drawings. The scope can identify inspection points, required documentation, findings, and follow-up actions within the agreed responsibilities.

It is intended for owners, engineering firms, and contractors that must support acceptance of geomembrane and containment systems, as well as insurers or inspectors requiring independent records before covering or commissioning.

Potential scope

  • Review of available specifications, drawings, and acceptance criteria.
  • Definition of inspection points and required records.
  • Visual inspection of materials, surfaces, details, and seams.
  • Recording of observations, nonconformities, and agreed corrective actions.
  • Document review and coordination with laboratories or independent inspectors when required.

Applications

Leach ponds, tailings facilities, reservoirs, landfills, and containment systems in mining, agriculture, and sanitation. Verification may cover incoming materials, prepared surfaces, completed seams, and finished details before covering or filling.

The level of control is defined according to system risk and contract requirements. Findings are documented with their location and agreed corrective action so acceptance does not depend on participants' recollection.

How we work

  • We define the inspection scope in writing before starting.
  • We record each finding with its location, applied criterion, and follow-up.
  • We coordinate with laboratories or independent inspectors when appropriate.
  • We deliver reports that support system acceptance.

Do you need to inspect an installation?

Add controls before covering, filling, or accepting the system. We define an inspection that provides useful evidence for decisions and supports acceptance of the work.

Preguntas frecuentes

When should technical inspection be incorporated?

Before and during installation, especially before covering, filling, or accepting the system, while observations can still be corrected.

Does the inspection include certification?

Inspection and certification are different services. The proposal clearly identifies the included controls, records, and reports.

Can you review completed work?

Yes, if access and the condition of the system allow it. The scope and limitations are defined before the visit.

What does the owner receive upon completion?

The agreed records and reports supporting observations, corrections, and system acceptance according to the contracted scope.