More usable area and greater stability for your project
We deliver solutions to retain soil, recover usable space and stabilize grade changes at mining sites, industrial facilities and infrastructure works.
We work according to approved project engineering and coordinate base preparation, reinforcing geosynthetics, compacted fill and drainage. The proposal clearly states what GEOALISI executes and what the project must provide.
This service brings execution of the reinforced system and its main interfaces into a coordinated scope. The sequence between foundation, reinforcement, fill, compaction and drainage is critical to building according to approved engineering. The proposal therefore distinguishes GEOALISI activities, project-provided conditions and the controls required to accept each stage.
Service scope
- Review of drawings, profiles and ground conditions.
- Preparation of the foundation and working surface.
- Installation of specified geogrids and reinforcing geosynthetics.
- Staged placement and compaction of fill.
- Execution of drainage and control of contracted finishes.
Where these systems are used
Reinforced-soil walls, slope containment, platform extensions, access routes and grade stabilization in mining, industrial and road projects.
To prepare the scope, we review height and geometry, soil type, expected loads, water presence, drainage, fill materials and available construction space.

How we work
- We review the engineering and actual ground conditions.
- We install reinforcement and place fill in layers.
- We execute the drainage included in the contracted scope.
- We control compaction, geometry and finishes.
Preguntas frecuentes
What projects use a containment system?
To stabilize grade changes, expand platforms, recover usable area and retain soil in mining, industrial and road projects.
Who defines the system?
Engineering and structural validation are the responsibility of the project’s qualified professional. GEOALISI supplies and installs the components included in the proposal.
What can execution include?
Foundation preparation, reinforcement installation, staged compacted fill, drainage and finishes, according to engineering and the contracted scope.
Why is drainage a key part of the system?
Because water can affect fill behavior and stability. Its solution must be coordinated with project engineering.

Do you need to retain soil or stabilize a grade change?
We assess the containment solution and coordinate execution to transform the grade change into a stable, usable surface.
