The project
A solution built for the actual requirement
A water storage pond with a capacity of 2,000 m³ was built in Negrete. The lining used 1.00 mm HDPE geomembrane and the project was completed in two days.
Case study
From the requirement to the solution
The requirement
Build a 2,000 m³ water storage structure and complete its impermeable lining within a short schedule. The solution had to cover the pond base and slopes with the material specified for the project.
The intervention
A 1.00 mm HDPE geomembrane was installed across the base and slopes. Execution was organized to complete the project within the reported two-day schedule.
What the system delivers
The water storage pond was built and lined with HDPE geomembrane within the reported two days. The photographs show the installed lining before the pond was filled.
Field record
The project in images