The project
A solution built for the actual requirement
At a residential development in Huechuraba, the stormwater drainage installation used 375 mm (15 in) corrugated HDPE pipe. Sections were connected with bell-and-spigot joints and watertight seals.
Case study
From the requirement to the solution
The requirement
Integrate stormwater conveyance into a residential development under construction, using pipe suitable for underground installation and joints incorporating watertight seals.
The intervention
A 375 mm (15 in) corrugated HDPE pipe was installed along the excavated alignment for the stormwater system. Pipe sections were connected using bell-and-spigot joints with watertight seals, as specified for the project.
What the system delivers
The work integrated stormwater conveyance and watertight bell-and-spigot joints into the development’s system. The photographic record documents the pipe in the trench, the alignment beside a chamber and the corrugated profile during execution.
Field record
The project in images



Your next project
Let’s assess the right solution for your project
We can support your project with supply, installation and technical advisory according to its scope.
